President Shavkat Mirziyoyev visited the central boiler house in the city of Andijan.
Recently, it was reconstructed at the expense of a preferential foreign loan, 3 energy-saving boilers of Chinese production are installed here. 28 kilometers of heating networks have been laid, 373 individual heating points have been created. A transformer with a capacity of 2 thousand kilowatts has also been installed and a high-voltage electrical line has been laid.
As a result, 271 apartment buildings and 30 social facilities in the city received access to centralized hot water supply and heating. At the same time, 16 million cubic meters of natural gas and more than 2 million kilowatt hours of electricity will be saved per year.
Information on projects planned for 2024-2026 is also provided here. Thus, it is planned to reconstruct 5 more boiler houses in the city of Andijan, build 33 kilometers of heating networks and modernize the internal heating systems of 114 apartment buildings.
The Head of State gave instructions to accelerate these projects in order to ensure stable heat supply to the population.